Part III. Matrix St. Luke’s Campus vs Downtown (using regulatory environmental criteria) - Downtown Hospital DEIS

Comments on the Downtown Hospital Draft Environmental Impact Statement (Draft EIS).  The Applicant is Mohawk Valley Health System. The Project is the proposed Hospital.

Part III. Matrix St. Luke’s Campus vs Downtown (using regulatory environmental criteria)
(Limited to these two sites because Applicant cannot be made to consider a site it does not own/have under option – see 6 NYCRR 617.9(b)(5)(v) (‘g’))






Summary Conclusion on Matrix:

Numerous adverse environmental impacts as identified by State regulation or law will be avoided or minimized by simply relocating the Project to the St. Luke’s Campus.


(continued)

1 comment:

Anonymous said...

The recent infrastructure/water main break in the downtown, was reported by the OD citing and infrastructure as old as 1921 or was it even older. What does this mean to a new hospital project and how will infrastructure be handled and built to assure service without major interruption? Has this issue been fully addressed?